What's new
Changes to the product, the app, the interface, the datasets and the documentation, newest first.
| Date | Area | Change |
|---|---|---|
| 2026-11-13 | Product | Sending a packed lot to ICE CoT and the EU Information System is now done by EUDR Farm. The organisation asks and confirms the statement is its own; an EUDR Farm administrator sends it, and the organisation sees the result. Farmers can be removed and restored for 30 days; farmer codes now show country, state and district; consent needs a signed-form photo or a code from the farmer's phone. |
| 2026-11-12 | Security | Uploaded documents and images are now kept in a private Cloudflare R2 store, encrypted by EUDR Farm before upload and shown only through the app. Database backups stay on the main server. |
| 2026-11-12 | Documentation | New guides on EUDR plot geolocation and on coffee and cocoa traceability; pages for cooperatives and for EU buyers; regulation status and the path from evidence pack to due diligence statement on the due diligence page; links to the regulation and the satellite map sources. |
| 2026-11-12 | Product | Faster home page on phones; a page menu on small screens; a smaller cookie notice on phones; public pages served from cache. |
| 2026-11-11 | Security | Evidence packs are signed by EUDR Farm (Ed25519) when the server has a signing key; the public key is published and the verification page checks the signature. |
| 2026-11-11 | Product | Reports from the concern form get a case reference. The contact form asks what the enquiry is about (demo, pilot, sales, support, partnership, privacy). |
| 2026-11-11 | Documentation | New pages: methodology, due diligence workflow, data protection, platform guide, security, and this page. |
| 2026-11-11 | Security | Daily backups with a monthly restore test, a health check for monitoring, HTTPS-only browser policy, security headers, server hardening. |
| 2026-11-11 | Product | Sign-up is for aggregators and cooperatives. |
| 2026-11-11 | Mobile app | Consent recorded on one page, with an explicit 'does not consent' choice. Redo when fixing boundary corners. Officer app in seven languages. |
| 2026-11-10 | Mobile app | The farm walk keeps recording with the screen off (Android). |
| 2026-11-10 | Product | ICE CoT: short supply-chain statement per country, exchange warehousekeeper facilities, product description on lots, challenged plots on the plot file page. |
| 2026-11-07 | Mobile app | Field officer and farmer apps redesigned. Sessions renew while in use. Farmers' changes are saved offline and sent later. Pause and resume a walk. |
| 2026-11-06 | Mobile app | Fix a corner before saving a boundary (move, delete, undo). Unsent records belong to the officer who made them. |
| 2026-11-06 | Product | Screening view with switchable map layers and the list of the 21 plot tests. |
| 2026-11-03 | Datasets | Plots are screened again before a lot is marked ready or packed when their screening is more than a year old. |
| 2026-11-01 | API | Due diligence statements can be filed with the EU Information System (EUDR web service v3) from a packed lot. |
| 2026-10-30 | Product | Plot visit assignments for field officers. |
Datasets in use
JRC Global Forest Cover 2020 v4; Hansen Global Forest Change GFC-2024-v1.12 (loss to the end of 2024); ESA WorldCover 2021 v200. Protected areas: not loaded. Details in the methodology.
Known limitations
- Tree-cover loss in 2025 and later is not yet visible to screening.
- The protected-area test does not run until a licensed dataset is loaded.
- Legal texts, consent wording and the document checklist are drafts awaiting legal review.
- No SMS or email provider is connected: farmers sign in with a code from their organisation, and password-reset emails are not sent yet.
- List calls in the interface return at most 500 records; paging is planned. No OpenAPI description is published yet.
- No independent penetration test or certification has been done.
